EPRI NP 6695 PDF

on nuclear power plants in EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake,” December This regulatory. These guidelines are in EPRI NP, “A Criterion for Determining Earthquake,” July ; EPRI NP, “Guidelines for Nuclear Plant. EPRI-NP Guidelines for Nuclear Plant Response To an Earthquake.

Author: Fenrizragore Zologami
Country: Czech Republic
Language: English (Spanish)
Genre: Education
Published (Last): 11 July 2006
Pages: 229
PDF File Size: 4.62 Mb
ePub File Size: 5.99 Mb
ISBN: 405-1-55751-179-3
Downloads: 69321
Price: Free* [*Free Regsitration Required]
Uploader: Gronos

The CAL confirmed the understanding that the plant operator was not to enter Modes 1 through 4 until the NRC has completed its safety evaluation and reported its conclusion to the plant operator in writing.

Cook and Palisades in Michigan. The NRC technical evaluation of restart readiness can be viewed at the following links: The inspections found that the equipment was in satisfactory condition. Sometimes there are multiple event reports, updating the rating, the event description. Here you only see the latest event report ERF send date: Thu, ERF description: Amplifying information concerning the NRC actions in response to the August 23, earthquake in Virginia is available in the NRC’s website at the following link: To demonstrate that no functional damage occurred as a result of the earthquake and that it was safe to operate the facility without undue eprj to the health and safety of the public, the North Nnp Power Station operator performed a number of inspections, tests, and analyses, consistent with EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake.

  BEROE PLACEMENT PAPERS PDF

If hundred incidents or more are within the map, the yellow perimeter indicates from where events are excluded.

EPRI-NP | Guidelines for Nuclear Plant Response To an Earthquake | Document Center, Inc.

wpri Drag or zoom the map to explore different areas. The plant exited the NOUE on the afternoon of August 24 after completing all walkdown inspections of the equipment that is most susceptible to seismic activity.

Here you only see the latest event report. None of the aftershocks resulted in any impact to plant structures, systems, or components.

There was a problem providing the content you requested

Cynthia Jones ERF address: Following the earthquake, both North Anna units experienced a complete loss epdi offsite alternating current AC power LOOP sources to emergency electrical buses due to the actuation of transformer pressure relays from the effects of seismic action.

The map shows a maximum of incidents. To demonstrate that no functional damage occurred as a result of the earthquake and that it was safe to operate the facility without undue risk to the health and safety of the public, the 6659 Anna Power Station operator performed a number of inspections, tests, and analyses under the oversight of the United States Nuclear Regulatory Commission. On August 23,an earthquake measuring 5.

  KETAKSAAN MAKNA PDF

Trial application of guidelines for nuclear plant response to..|INIS

Therefore, on August 26, the operator declared all safety-related SSCs of Units 1 and 2 inoperable for technical specifications purposes. Contact us if a location is wrong. A backup, “station blackout” diesel generator was started to assume the loads that were being supplied by the 2H EDG.

Units 1 and 2 entered cold shutdown conditions on August 24, and August 25,respectively. Due to additional seismic activity, North Anna declared an NOUE on two other occasions with the final one being declared on September 1, All of these plants exited their NOUE declarations after completing inspections and receiving confirmation of normal conditions.

Last update on 01 Dec ERF affiliation: On August 29, the NRC dispatched an Augmented Inspection Team AIT to the North Anna Power Station to assess the circumstances surrounding the total loss of offsite power and dual unit reactor trip, the emergency diesel generator fpri leak and other plant equipment issues.