KTA 3902 PDF

KTA KTA Page 4 Comments by the editor: Taking into account. Buy KTA Design Of Lifting Equipment In Nuclear Power Plants from SAI Global. and Transportation Equipment for Heavy Loads, Radioactive Waste and Materials in Accordance with German Nuclear Standards KTA , and

Author: Nera Maumi
Country: Republic of Macedonia
Language: English (Spanish)
Genre: Music
Published (Last): 15 April 2006
Pages: 122
PDF File Size: 20.9 Mb
ePub File Size: 15.21 Mb
ISBN: 625-4-34755-989-2
Downloads: 76582
Price: Free* [*Free Regsitration Required]
Uploader: Shaktizuru

Other important kra are overspeed detection and emergency stop. Norbert Schilling and Uwe Fischlein enhanced the importance of safe lifting for all kinds of loads, not only heavy ones, at nuclear power plants. Primary hazard should be eliminated by design. Roland Verreet also recommends that the groove angle of the sheaves should be greater than 45 o to reduce rope twist.

Industries Mta Nuclear Industries Aerospace. This gives a reliability criterion of a few per crane, per year for an accident involving release of radioactive material limited to site borders. The safety work therefore focuses on establishing a hierarchy of safety.

The inbuilt torque limiter acts as an absolute protection against two-blocking and load hang-up. At Sellafield there is a huge number of lifting devices of varying ages and conditions.

Safety guide KTA – Design of hoisting devices of nuclear..|INIS

A kra ton hoist was used to finally lift a 40 ton trolley up on top of the polar crane bridge, which needed some innovative thinking.

As a Crane and Lifting Equipment Engineer you 390 responsible for implementing the technical requirements and analyses of cranes and lifting equipment. You will follow high safety culture principles in your own work and suppliers activities during the whole process.

  JOHN SCALZI VNEK HBORJA PDF

Accidents occur faster than the reaction time of human beings Parallel systems, where the supervisory PLC is connected beside the Flux Vector Drive PES are superior to serial systems, which are not single-failure proof. Enhanced safety design means redundant mechanical load paths on the hoist, supervisory controls that independently monitor basic crane operations and a control system providing automatic safety shutdown.

An extensive modernisation project has been carried out in the last few years. Igor Chornyy from Chernobyl Nuclear Power Plant in Ukraine and Eric Schmieman from Battelle Memorial Institute in the United States told the ktq about the basic facts of the accident and about the new safe confinement under construction. The group was guided through the laboratory and the welding process 392 the copper canisters was displayed in detail.

English-German Dictionary

Stromag has developed a questionnaire which helps to select the correct brake equipment regarding safety factors and dimensions. Roland Verreet finished his presentation with an encouraging comment about this initiative mta create a network between nuclear power plants. Simplicity, robustness and redundancy should always be the guidelines for mechanical design.

The project had to be completed in only 8 days. The problem is that the core will break before the outer strands due to the design. Therefore it is important to make inspections in the right sections of the wire.

Do you want to join our team? We are looking for several development-oriented professionals to join our remarkable and unique project.

The crane can be controlled from the cabin, ground control or via remote control. To avoid problems with safety brakes the company has developed a new solution, the MotoSuiveur, which is attached to the drum. Limit switches, overload indication sensors, eddy current brakes and synchronous motors can prevent many failures. The rest of the ,ta is history and can best be recalled by looking at the photos….

  ANISOTROPIC PLATES LEKHNITSKII PDF

Reactor Building Cranes

The captured foreigners were taken into a dark cellar and dressed in sackcloth shirts and a horned Viking helmet. The crane operation takes place either via cabin control or remote control. High local contact stresses between the steel core and the outer strands can cause severe internal breaks and discarding of the wire. Surprisingly enough the water proved to be bitterly salt — reminiscence from the stone age Littorina Sea, which preceded the present Baltic Sea. Semi portal cranes transport loads e.

All parts will eventually fail, but a good control system design must accommodate these failures and keep the load safe. The solution is to compact the wire elements at the contact surface between the core and the outer strands.

Nuclear Regulatory Commissionmanufacturers of cranes, controls and other equipment, constructors of kra facilities, 33902 and consultants. KIKA was founded in to improve the contacts between professional crane users in the Swedish nuclear industry. Otherwise Konecranes would have to pay a considerable fine.